Green Hydrogen for Heavy-Duty Trucking: Why Curtailed Renewables Change the Economics
Where to build, what it will cost, and why the next 10 years matter
READ THE LATEST
Most Popular
View all
Small data centers are paying five times too much for electricity
Apr 27
•
Abhijit Das
1
How the U.S. Can Strengthen Industrial Competitiveness in Heavy-Duty Electric Vehicles
Dec 8, 2025
•
Abhijit Das
1
Player or Spectator: A Different Way to Look at Life
Feb 4
•
Abhijit Das
1
1
1
Do We Have Enough Minerals for the Energy Transition?
Jan 1
•
Abhijit Das
1
Recent posts
View all
Your Electricity Bill Depends on Where — and When — the Load Goes
A consulting firm called E3 just published a study on what happens to your electricity bill when trucks go electric (full report).
Jun 8
•
Abhijit Das
Why Data Centers Go Where They Go — And Where They Should Go Instead
This is a follow-up to my earlier post on data center location attractiveness based on energy price alone.
May 21
•
Abhijit Das
I Almost Skipped This One Too
I didn’t attend my PhD graduation.
May 11
•
Abhijit Das
Where Should the Next Data Center Be Built?
A State-by-State Analysis of Energy Cost and Curtailment Opportunity
May 4
•
Abhijit Das
Small data centers are paying five times too much for electricity
And the fix exists. The barrier is mostly regulatory, not technical.
Apr 27
•
Abhijit Das
1
The Grid Is Not Broken. It Just Doesn’t Know How to Coordinate.
Part 2 of 2 — The Solution
Apr 9
•
Abhijit Das
1